Question: How Much Can An Excavator Dig In A Day?

How many feet can an excavator dig in a day?

Trencher Production “That’s one trench with one operator, opening up 10,000 feet of trench per day, whereas one excavator can open up 1,000 to 1,500 feet per day..

How many feet per hour can a mini excavator dig?

Dug, pipe laid and backfilled about 11 to 13hours, only digging can be done in 9 hours or so. We average 280-300 ft per hour digging a 48″ deep trench with an excavator putting in non grade lines to pivots. Usually we step the trench about a foot for ease of access.

How deep does a mini excavator dig?

A 4,000- to 6,000-pound mini excavator can dig a 10-foot-deep hole. Larger 10,000- to 12,000-pound mini excavators allow dig depths as deep as 14 feet.

How do you calculate the capacity of a bucket excavator?

The total amount of material carried by a bucket is the amount inside the bucket plus the amount piled on top of it. This is called the Heaped or Rated Capacity. The amount of material piled on top of the bucket, (heap), is determined by the angle of repose of the material being handled.

How do I calculate basement excavation?

Establish, from the basement plans, the external depth, width and length of the finished basement. Record these as D, W and L. For example, if the depth is 10 feet, the width is 20 feet and the length is 30 feet, you would have D = 10, W = 20 and L = 30.

How do you calculate footing excavation?

Volume of excavation=4.60 Mtr.=0.30 Mtr. + 3.00 Mtr. … =3.60 Mtr.Total Volume of excavation. = 4.60 Mtr x 3.60 Mtr. … = 49.68 CUM.Volume of backfilling. = Volume of excavation – Volume of concrete.Backfilling is done after the construction of PCC, footings, columns. … Volume of pcc.More items…•

What is cut and fill excavation?

Cut and fill excavation This is the process of excavation whereby the material that is cut or stripped. The removed topsoil and earth can be used as fill for embankments, elevated sections, and so on.

How much excavation can be done in a day?

It depends upon the soil type and machine category. For ordinary gravelly soils with JCB ( around 40HP) will excavate around 30-40 Cum per Hour and in sandy soils it is about 35-45 CUm . In case of Escors Ex 60 it may increase about 20% and more workability.

How much does an excavator charge per hour?

You can expect to pay anywhere from: $95/hour for a bobcat or small two-tonne excavator. $105/hour for a 6-tonne excavator. $140/hour for the combined service of an excavator and tip truck.

How do you calculate excavator productivity?

The formula is as follows: Q = (60_q_z_n_kf) / kl, where Q is the productivity of the excavator, q is the capacity of each rotor bucket in cubic feet, z is the number of buckets on the wheel and n is the speed of rotation of the rotor, measured in revolutions per minute.

How much can a excavator lift?

At this starting point, the machine has 34,210 pounds of lift capacity, so the 3,600-pound pipe on the hook isn’t much of a challenge. But, as you ease the load 5 feet off the ground, thus raising the bucket’s lift point to 10 feet, capacity diminishes to 29,630 pounds.

What is the average cost of excavation?

What Are the Excavation Costs per Hour in Australia?Excavation costs in AustraliaAustralian State / TerritoryAverage excavation costs per hourSouth Australia$80/hrWestern Australia$88/hrNew South Wales$90/hr3 more rows•Jun 7, 2019

How do you calculate backfill and excavation?

Backfill for Figure 3.1:Backfill volume = excavation volume – footing volume – wall volume. … (Note that only the portion of the wall that is in the trench is deducted, so the height of wall in the trench is the average trench depth minus 2′-0” for the footing: 6′-0” – 2′-0” is 4′-0”)Backfill volume = 207.4 cubic yards.

How do you calculate excavation?

So, the formula is: Ab = Wb * Lb, where Wb and Lb are the width and length of the bottom of the excavation. At = Wt * Lt, where Wt and Lt are the width and length of the top of the excavation.

How many feet per minute will a trencher dig?

30 feetThe trencher offers a cutting depth of 12 inches and can trench up to 30 feet per minute.

How do you calculate excavator cycle time?

Start timing when the excavator bucket begins to “dig in” and stop timing when the bucket again begins to dig in. Divide 60 by the cycle time to learn the number of cycles per hour. If the cycle time is . 5 minute, 60 / 0.5 = 120 cycles per hour.

How much is a dry hire excavator?

What are typical Excavator Hire Rates?Excavator SizeAverage Dry Hire RatesAverage Wet Hire Rates20-25 Tonne Excavator$90+ GST per hour$170+ GST per hour26-30 Tonne Excavator$105+ GST per hour$180+ GST per hour30-35 Tonne Excavator$120+ GST per hour$190+ GST per hour40 Tonne Excavator$165+ GST per hour$225+ GST per hour8 more rows

How do you calculate topsoil excavation?

To calculate how much topsoil you need, simply measure the dimensions of the area you wish to cover and multiply this by the depth required. Measuring in metres is simplest, as this will give you the volume of topsoil you need in cubic metres. For example: A site has an area of 10m x 15m and needs a coverage of 150mm.

How is earth excavation cost calculated?

of days required for 10m3 excavation = 10/242.4242 = 0.04125 days. Likewise, based on the capacity of other equipment, labors etc., their cost is calculated. Contractors profit is also added to the total cost of labors and machineries. Then grand total gives the rate of excavation per 10m3 of soil excavation.

How many hours does an excavator last?

Don’t rush into into a second hand excavator We aim to sell equipment before it reaches the 2,000 hour mark, and given that excavator equipment can be expected to last between 7,000 and 10,000 hours before needing repair, buying a second hand excavator from us will give you many, many hours of work.

How much fuel does an excavator use per hour?

It all depends on the excavator. A cat 330 will use between 10 and 14 gallons per hour. And an Hitachi 350 or Komatsu 300 will use between 5 and 8 gallons per hour.